A specialist marketplace by BottlingScoutBottlingScout.com ↗

BottlingScout knowledge

Inspect upstream presentation and closure result

tape, hot-melt, flap control and line integration · international secondary packaging

Look at the case entering the sealer: dimensions, board condition and flap presentation affect the project brief. Compare adhesive or tape equipment against the packaging you use.

01

Inspect upstream presentation and closure result

Run representative cases and observe alignment, flap handling and discharge. Review the installed tape or adhesive configuration and document adjustments and rejects. Ask for available maintenance records and a precise list of supplied components.

02

Verify identity and scope

Match serial plates, year, manuals, electrical drawings and the seller’s equipment list to every module offered.

03

Inspect condition

Check wear parts, lubrication, bearings, product-contact areas, safety systems, controls, obsolescence and visible modifications.

04

Test with evidence

Whenever possible run the equipment with representative product and formats, recording speed, rejects, alarms and changeover requirements.

WhatsApp