A specialist marketplace by BottlingScoutBottlingScout.com ↗

BottlingScout knowledge

Inspection and due diligence

tape, hot-melt, flap control and line integration · international secondary packaging

Independent checklists for inspection, comparison, relocation and commissioning. This guide is written for packaging operations automating case closure and should be adapted to the actual machine and production project.

01

Verify identity and scope

Match serial plates, year, manuals, electrical drawings and the seller’s equipment list to every module offered.

For Used Case Sealers, pay particular attention to tape, hot-melt, flap control and line integration.

02

Inspect condition

Check wear parts, lubrication, bearings, product-contact areas, safety systems, controls, obsolescence and visible modifications.

For Used Case Sealers, pay particular attention to tape, hot-melt, flap control and line integration.

03

Test with evidence

Whenever possible run the equipment with representative product and formats, recording speed, rejects, alarms and changeover requirements.

For Used Case Sealers, pay particular attention to tape, hot-melt, flap control and line integration.